The Village of Theresa has contracted with HydroCorp for Cross Connection inspections. If you received a letter (as shown) this is legitimate and you do need to call them to set up a time for inspection. If you do not schedule an appointment, you will be non-compliant and could potentially have your water service disconnected on 8/30/2021. Thank you.
