What’s Up THERESA, V.2 June 2023: https://cdn.townweb.com/villageoftheresa.com/wp-content/uploads/2023/06/V-2-June-2023.pdf

Village of Theresa

SSO

Due to a break in our sanitary sewer force main on 6-22-21 we endured a sanitary sewer overflow.  The break was repaired the same day.  Untreated wastewater did flow onto the grass and into the Rock River until the break was isolated and repaired.