SSO: Due to a break in our sanitary sewer force main on 6-22-21 we endured a sanitary sewer overflow.  The break was repaired the same day.  Untreated wastewater did flow onto the grass and into the Rock River until the break was isolated and repaired.

Village of Theresa

2020 SPRING BULK PICK UP CANCELLED

Due to the Coronavirus/COVID-19, the Spring Bulk Pick-Up for the Village of Theresa scheduled for April 21st, 2020 is cancelled until further notice.